(ГУББГ) /Geodesy, Waterworks and Construction Department/ has planned to install new stormwater drainage systems on roads at seven locations this year. Additionally, in cooperation with the Capital City Road Development Authority, 1.3 km of stormwater drainage systems will be installed at two locations.